Wind Farms Graphic

Wind Farms

Beniach Construction Company has become an expert in roadwork services. Combine that with our understanding of the unique needs of wind farm developers, and we’ll pave the way for your next wind farm project. And we’ll do it within your schedule.

Check out a few of our wind farm projects below.
 

Blooming Grove Wind Farm - 2021

Blooming Grove Wind Farm including 36 miles of pulverization, base prep, Oil and Chip, ditch work and seeding.

Bright Stalk Wind Farm - 2021

Bright Stalk Wind Farm including 22 miles of Oil and Chip reseal.

Harvest Ridge Wind Farm - 2021

Harvest Ridge Wind Farm including 29 miles of roadway excavation, ditch work, aggregate base course, and new pipe culverts.

Blooming Grove Wind Farm - 2020

Blooming Grove Wind Farm included 36 miles of Pulverization, new culvert pipe installation, culvert strengthening, aggregate base course, drainage improvements, and ditch work.

Bright Stalk Wind Farm - 2020

Bright Stalk Wind Farm including 22 miles of Oil and Chip, ditch work, and seeding.

Bright Stalk Wind Farm - 2019

Project included 22 miles of Roadway pulverization, drainage improvement, ditch work, install 4” additional roadway aggregate, and 14 turning radii.

Hoopeston Wind Farm - 2015

Site restoration, eliminate compaction, and seeding of all disturbed areas at the site.

Pilot Hill Wind Farm - 2015

Installed 62 cross road drainage culverts and regraded and prepped for oil & chip approximately 32 miles of public roadways.

Hoopeston Windfarm - 2014

Pulverization, soil cement, and strengthening of 10.5 miles of public roads. Also constructed 14.5 miles of access roads to the wind turbines and 39 miles of crane path for the erection cranes, 25 Roadway Crossings for cranes crossing public roadways, and installed 8 public road and 45 private road turning radii for the large deliveries of components.

Pilot Hill Wind Farm - 2014

Pulverization, soil cement, strengthening, and dirt shoulders on 24.93 miles of public roadways. Roadway maintenance was also included with this project.

Twin Groves Repairs 2013

Pulverization, roadway excavation, base repair, compaction, prep of base, primecoat, and A-3 of 2 miles of Windfarm Roadways in Illinois.

Wildcat Windfarm 2013

Prep of Base, Primecoat, and A-4 Sealcoat on 57 miles of Windfarm Roadways in Indiana.

Settlers Trail Windfarm 2012

Prep of Base, Primecoat, and A-3 Sealcoat on 36 miles of Windfarm Roadways in Illinois.

Top Crop II Windfarm Repairs 2012

Pulverization, Compaction, Prep of Base, and Sealcoat 47 miles of Windfarm Roadways in Illinois.

Pioneer Trail Windfarm 2012

Prep of Base, Primecoat, and A-3 Sealcoat on 35 miles of Windfarm Roadways in Illinois.

Top Crop II Windfarm Repairs 2011

Excavate existing low water crossing, install new culvert pipe, headwalls and toewalls, and pour new PPC concrete crossing.

Cayuga Ridge Wind Farm – 2010

Strengthening of 33 miles of rural roadways “after” the development of 150 Turbines from Right of Way to Right of Way including pulverization, strengthening, pipe and box culvert work, shoulder work, ditch work, radii installation, grade corrections, and oil & chip.

Meadowlake III & IV Wind Farms – 2009/2010

Strengthening of 15 miles of rural roadways for the development of 116 Turbines from Right of Way to Right of Way including pulverization, strengthening, pipe and box culvert work, shoulder work, ditch work, radii installation, grade corrections, and oil & chip.

Top Crop Wind Farm - 2009

Strengthening of 23 miles of rural roadways for the development of 67 Turbines from Right of Way to Right of Way including pulverization, strengthening, pipe and box culvert work, shoulder work, ditch work, radii installation, grade corrections, and oil & chip.

Railsplitter Wind Farm - 2008/2009

Strengthening of 17 miles of rural roadways for the development of 67 Turbines from Right of Way to Right of Way including pulverization, strengthening, pipe and box culvert work, shoulder work, ditch work, radii installation, grade corrections, and oil & chip.

Twin Groves Wind Farm - 2007

Strengthening of 30 miles of rural roadways for the development of 120 Turbines including pulverization, strengthening, pipe and box culvert work, shoulder work, radii installation, grade corrections, and oil & chip.

Contact us
307 South Main St. Tuscola, IL 61953
phone
217-253-6100
fax
217-253-6144